North West Division

We Rule the Grades!

 


Marias Pass 3.1 Freight Operations

 
 
NEMP-109-09-Must-Ret01 work order

 

NEMP-109-09-Must-Ret01

----------------------------------------

Work Order: NEMP-109-09-Must-Ret01

Time: 5:40p

Season: Summer

Weather: Rain (for a slower machine, FogBanks from Sky! or the Kosmos equivalent)

Difficulty: Medium

Duration: 3hr 23min

Train: AC6000CWs & Dash 9s

Class: 3 (due to night, weather and no paths)

----------------------------------------

After dropping off the sick Mustangs at Dierker Farms, you are on the return load continuing from Blacktail Siding where we paused in the previous part.

 

SPECIFICS:

Leave last two helpers 0-2,3 at Belton Siding 1 at the far end of the siding (Switch you own)

 

Pickup Loggers 32769-0-7 at Columbia Falls Siding 2 (do own switching). Leave your cars before the siding begins, then switch yourself onto CF Siding 2. Go around and back into the loggers, pushing them and the rest of the train (when you get there) as far back as you need. Considering it is on a severe grade, you may have to back down a ways to get a run at it, but it can be done (almost gracefully) ;-)

 

Since we can't exchange engines en-route, I've made the items below optional with no specific WO entries. You will not be penalized if not completing them, but they will show up on the evaluation as complete or not completed.

 

Pickup 32784-0-1 (Replacement Engines) at Kalispell  (optional)

Drop Above Loggers at Kalispell Yard Siding7  (Optional)

Drop  0-4-8 (explosives cars) at Kalispell Yard Siding 5 (optional)

The rest of the consist will be delivered to LV & ADF so for now continue on to ADFRR to spend the night. We will come back here and complete the LV part at a later date.

 

RobertR #109

 

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 02:51 PM
Copyright © MMIII Mutagenix Inc.