North Eastern Railroad
Freight Activity (c) MMII
NESE EV01
Everet
Intermodal 8
am Part 1
----------------------------------------
Work Order: NESE EV01
Time: 8 a.m.
Season: Summer
Weather: Clear
Difficulty: Medium
Duration: 1 hour
Train: GP38-2 #1000 +
GP38-2 #1011 + GP35 #2035
Class: 3
----------------------------------------
You'll be starting in
Delta Junction WYE driving a set of GP38s and a
GP35.
Proceeding to Delta
Junction siding #10 to pick up some empty
doublestacks
and
then some more at Preston Point Siding #2 and relay
them to Everett
Siding
#2.
Then head on down to
the Everett Intermodal
area to sidings #s 5, 4 then 3
and
get the Full Double Stackers (blue ones). Pick up a
few more further down
the
road at Everett #15 and take them to
Pidgeon Creek siding #1.
Cut 20 of
these
on siding #1 and then put the rest on Siding #2.
NOTES:
You have only 1
reversing point to control you and AI
signaling and because
the
crossover switches are automatic ones. Otherwise
this is a Class 3
activity, and you do your own switching.
Follow the work order above, place
cars on sidings.
When backing to
Pidgeon Creek Siding #1
be sure not to pass the
aspect signal
with the 1st GP38, otherwise it'll will turn
red and not let you continue.
After cutting the rest
of the train to siding #2 pull forward to the red
aspect light and stop to finish this part of
the Work Order.
Route: Seattle with
Passenger Update
Drive Safely!
________________________________________
Bob
Artim
North Eastern Railroad