Work Order: NEWH-067-03C
Time: 9:00
Season: Summer
Weather: Clear
Duration: 5:30
Train: SD40-2
Class: 2
After a an overnight
stay in Whitefish, it is time to head out for the
run to Sandpoint
Maximum Speed 40 MPH
ENFORCED!
Watch your level
crossings and signals.
Use Brakes and Dynamics
with Pridence or you
risk having a runaway on some portions of this
route.
** Bring a camera and
enjoy the View But pay attention to your train.
Subject: Delivery of 6
Generators and 30 coils of high transmission wire.
(Subject to change
based on engineering demands or project extension)
The
engineering Department of Washington State Power
Authority has tendered the contract to NERR (North
Eastern Railway) the task of delivering 6 generators
to Rock Island Hydro Electric Project on the
Columbia River Approximately 12 Miles downstream
from Wenatchee Washington.
Said Equipment to be delivered in bulk on the agreed
upon Date.
Penalties will
assessed if work is
delayed or the project is halted.
Monies owing for this
transportation will be paid in full at completion,
NERR to provide all
State and Federal operating Permits and Permissions
Operating rights on NERR track lines from points of
origin for oversized load and weights.
All engineers and
conductors are to be certified railway personnel and
security is of concern.
The Dam has been
closed, and all of the Current electric generating
equipment is being removed and upgraded. This is not
a staged Project as the Dam and facilities are
getting a complete refit.
Thank you for your
prompt attention to this matter.
We look forward to
doing business with you.
Washington State Power
Authoity
On
behalf of the Rock Island Power Project.
Take this train to
Sandpoint. Stop at the station for your crew
change. Traffic will be kind of heavy, so mind the
signals.