North Eastern
Railroad Freight
Activity (c) 2004
NEWH-150-01 Delivering
logs from Sandpoint to Whitefish.
____________
Work Order:
NEWH-150-01d
Time: 1:00 PM
Season: Summer
Weather: Clear
Difficulty: Easy
Duration: 3 hr 20 min
Train: AC6000x3x26
loaded log cars
Class: 1
_____________
Work Order:
Move train to Whitefish
We've been waiting at
Troy for about 45 minutes for some malfunctioning
signals. (We get to watch the local switcher.)
Dispatch has assured us the problem will no longer
exist after Troy. "Morning
George. What a beautiful day! I have our work
order. You're going to enjoy this run...nice and
easy. We're to assemble a Log Train here in the
Sandpoint area, and
deliver it to Whitefish.
Dispatch will assist you by throwing some of the
switches along the way. You will be responsible to
make sure they are in the correct position before
proceeding thru them. Follow the
path...watch your speed...and listen to me.
Everything should be just fine. Hey! Where did all
this traffic come from??"
Speed Limits:
Switches: 20 mph
Mainline: 50 mph
All others: or less as
posted
Eric #150 (butter.cub@mindspring.com)
idea and testing: Keeper, NERR Engineer 235