South West Division

Expectations? ... Met!

 


Full Bucket Freight Operations

 
 
NEFB 088-05 work order

 

North Eastern Railroad (c) 2002

Wednesday 12:58 p.m.

----------------------------------------

Work Order: NEFB 088-05

Division: Freight Operations

Time: 12:58 p.m.

Season: Summer

Weather: Clear

Difficulty: Medium

Duration:  1 hrs 20 min

Train: EMD SD70M #9237

Class: 2

----------------------------------------

There are no Temporary Speed Restrictions during this activity.

 

For this activity you will be using an EMD SD70M #9237. Your dispatch call numbers are the same 9237. 

 

Clearances:

 

You are cleared to enter the eastbound mainline at Yonder at 1:00 p.m.

You are cleared to enter the westbound mainline at Fort Fairfax at 2:00 p.m.

You must leave the mainline at Lena’s Mining by 2:20 p.m.

You must be ready to re-enter the mainline ahead of the clearance time for each point listed above, or clearance will not be granted.

 

Having finished lunch you have to pick up two consists of empty coal hoppers at Yonder. Drop the empty coal hoppers off at the St. Josef platform. Verify that the last car of the consist has cleared the mainline before dropping the hoppers. The St. Josef Yard crew will pick them up there after you have left St. Josef. The Yard crew has filled a coal consist for you to pick up from the St. Josef siding, pull it to the Fort Fairfax Yard. In Fort Fairfax there is a consist of empty coal cars for you to pick up and pull to Lena’s mining. When you arrive at Lena’s mining pull to the end of siding 2 and stop your train, The yard crew will take care of the hoppers for you.

 

The cars locations and destinations are as follows:

 

32772-0 to 15    from Yonder Siding North    to St. Josef platform.

32792-0 to 15    from Yonder industrial 1       to St. Josef platform.

( The above consist must be assembled in the following order: 32772-0 to 15, 32792-0 to 15)

32804-0 to 31    from St. Josef Siding             to Fort Fairfax Siding 1.

32800-0 to 31    from Fort Fairfax Siding 4    to Lena’s Mining 2.

 

Drive Safely!

_______________________

Peter

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 03:02 PM
Copyright © MMIII Mutagenix Inc.