North Eastern Railroad
(c) 2002
Wednesday 3:00 p.m.
----------------------------------------
Work Order: NEFB 088-07
Division: Freight
Operations
Time: 3:00 p.m.
Season: Summer
Weather: Clear
Difficulty: Medium
Duration: 2 hrs 25 min
Train: EMD SD70M #9237
Class: 2
----------------------------------------
There are no Temporary
Speed Restrictions during this activity.
For this activity you
will be using an EMD SD70M #9237. Your
dispatch call numbers are the same 9237.
Clearances:
You are cleared to enter
the eastbound mainline at Lena’s Mining at
3:05 p.m.
You are cleared to enter
the westbound mainline at Fort Fairfax at
3:30 p.m.
You are cleared to enter
the eastbound mainline at the Simonville
branch at 4:25 p.m.
No time set for
re-entering mainline at Fort Fairfax on your
return run from Simonville.
You must return to Lena’s
Mining by 5:25 p.m.
You must be ready to
re-enter the mainline ahead of the clearance
time for each point listed above, or
clearance will not be granted.
Drop off your consist of
full coal cars at Fort Fairfax. Deliver
mixed freight to Simonville and pick up
unloaded cars there. Drop the unloaded
freight cars in Fort Fairfax and pick up a
consist of empty coal hoppers. Bring the
hoppers to the track next to the loading
track at Lena’s Mining. Stop your train when
the last car has cleared the switch entering
track 2.
Location and destination
of cars:
View work order.
Hint: When dropping off
mixed freight cars at Simonville, drop them
at the base of the wye and turn your engines
in the wye. Stop immediately after exiting
wye and reverse the consist into the siding.
Do not drive up to the reverse point until
having dropped the consist on the siding.
Drive Safely!
_______________________
Peter