South West Division

Expectations? ... Met!

 


Full Bucket Freight Operations

 
 
NEFB 100-01B work order

 

NEFB 100-01B From Fort Fairfax to Lena's Mining on the FBL2

Work Order: NEFB 100-01B

Board:

Time: 9:25 a.m.

Season: Autumn

Difficulty: Easy

Duration: 1 hour

Train: NERR GP38-2 Units 1005 and 1011

Class:

-------------------------------------------

Activity Series:

The Work Orders have you starting with two consists of empties that were dropped off at the Fort Fairfax sidings. You will move up the line to Yonder swapping out the empties for loaded cars. As you arrive at Yonder you will have gone from the easy load of an empty set of cars to one fully loaded train. For FBL Version 2.

---------------------------------------------

Description of this Work Order:

NEFB 100-01B From Fort Fairfax to Lena's Mining on the FBL2

(Continuation of Work Order NEFB 100-01A Fort Fairfax to Old Thomas Mine. )

You are operating from the Fort Fairfax yard to Lena's Mining where you will drop off three empty cars and pickup three full cars. (all NERR 3 Bay ACF Hopper)

First assemble the train at the Fort Fairfax yard and then proceed to the sidings at MP1222.

Obey all signals and request permission to pass Stop Signal. Some Reds are restriction only.

Note loaded cars are next to the power and empties at the back.

Dispatch have us delivering three empties to the Lena's Mining.

The mine is run by Old Thomas's granddaughter.

Local procedure will have you cut your train, take the empties up to the loading track and back down with the full cars. Reassemble the train and you're on your way.

The activity will terminate when you're clear of the sidings at about MP1223.

The next activity will pick up from that spot

GaryH

NERR Engineer #100

--------------------------------------

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 03:02 PM
Copyright © MMIII Mutagenix Inc.