South West Division

Expectations? ... Met!

 


Full Bucket Freight Operations

 
 
NEFB 100-01C work order

 

NEFB 100-01C From Lena's Mining to Josha's Cradle on the FBL2

Work Order: NEFB 100-01C

Board:

Time: 10:20 a.m.

Season: Autumn

Difficulty: Easy

Duration: 40 minutes

Train: NERR GP38-2 Units 1005 and 1011

Class: 4

-------------------------------------------

Activity Series:

The Work Orders have you starting with two consists of empties that were dropped off at the Fort Fairfax sidings. You will move up the line to Yonder swapping out the empties for loaded cars. As you arrive at Yonder you will have gone from the easy load of an empty set of cars to one fully loaded train. For FBL Version 2.

---------------------------------------------

Description of this Work Order:

NEFB 100-01C From Lena's Mining to Josha's Cradle on the FBL2

(Continuation of Work Orders NEFB 100-01A Fort Fairfax to Old Thomas Mine and NEFB 100-01B Fort Fairfax to Lena's Mining. )

You are operating from Lena's Mining to Josha's Cradle where you will drop off three empty cars and pickup three full cars. (NERR Red, Blue and Green Box cars)

You are under way having just left the main line siding near Lena's Mining.

Obey all signals and request permission to pass Stop Signal. Some Reds are restriction only.

Note loaded cars are next to the power and empties at the back.

Dispatch have us delivering three empties to the Josha's Cradle siding.

Local procedure will have you cut your train, pull out the loaded cars and back in the empty cars. Reassemble the train and you're on your way north to Simonville.

The activity will terminate when you're clear of the sidings at about MP4.

The next activity will pick up from that spot

GaryH

NERR Engineer #100

--------------------------------------

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 03:02 PM
Copyright © MMIII Mutagenix Inc.