South West Division

Expectations? ... Met!

 


Full Bucket Freight Operations

 
 
NEFB 100-03A work order

 

NERR Copyright 2003

==================

NEFB 100-03A From Yonder to Lake Hurst on the FBL2

Work Order: NEFB 100-03A

Board: Extra

Time: 13:30 p.m.

Season: Autumn

Difficulty: Easy

Duration: 1 hour 15 minutes

Train: NERR GP38-2 Units 1000 and 1005

Class: 3

-------------------------------------------

Temporary Speed restriction between MP 1256 and 1257

Obey all signals. Some Reds are restriction only.

Signal Aspect Flashing Yellow: Rule 282a 40 mph

Signal Aspect Solid Yellow: Rule 285 30 mph

Signal Aspect Flashing Red: Rule 290 15 mph

Signal Aspect Red with Number Plate: Rule 291 Stop, request permission (Tab), proceed

--------------------------------------------

Activity Series:

The Work Orders have you starting at Yonder. After pickups on route you will make deliveries to the FB Proving Ground. Lake Hurst will be the terminal. For FBL Version 2.

---------------------------------------------

Description of this Work Order:

NEFB 100-03A From Yonder to Lake Hurst on the FBL2

You are operating from Yonder. You will pickup cars at Black Pump Mining. Drop the train on Lake Hurst siding #7. Park at the refuel track.

--------------------------------------------

Dispatch have us picking up 7 loaded coal gondalas at Black Pump Mining.

-----------------------------------------------------------------------

Local procedure Black Pump:

+++++++++++++++++++++++++++

Stop short of light, cut your train behind the power, proceed into the siding and pull out the loaded cars. You must be back to your train by 14:00. Obey all signals and speed limits. Reassemble the train, remain on the siding [you may have a GREEN but you do NOT have clearance] until the incoming freight clears. You're on your way after the 14:05 meet.

Local procedure Lake Hurst:

+++++++++++++++++++++++++++

Drop off the cars on Lake Hurst Siding #7. Make sure that you pull far enough ahead to get the conductor message. Stop at the Lake Hurst refuel track next to the pumps.

---------------------------------------------

This activity will terminate at the Lake Hurst refueling siding

GaryH

NERR Engineer #100

Certificate #02-2-NERR100D

-----------------------------------------------

Pickup the consist on Yonder Siding North.

Pickup the coal gondalas at Black Pump.

Dropoff all cars on Lake Hurst Siding #7.

Park engines at Lake Hurst Fuel Track and stop by pumps.

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 03:02 PM
Copyright © MMIII Mutagenix Inc.