NERR
Copyright 2003
==================
Mount Oliver
on the FBL2
Work Order:
NEFB-DFD-100-04C-MOL
Board:
Divisional Timetable
Time: 9:55
a.m.
Season:
Winter Snow
Duration: 1
hour 20 minutes
Train: NERR
SD70M Unit 9237
Class: 1
-------------------------------------------
Obey all
signals. Some Reds are restriction only.
Signal Aspect
Flashing Yellow: Rule 282a 40 mph
Signal Aspect
Solid Yellow: Rule 285 30 mph
Signal Aspect
Flashing Red: Rule 290 15 mph
Signal Aspect
Red with Number Plate: Rule 291 Stop,
request permission (Tab), proceed
--------------------------------------------
Activity
Series:
Work Orders
have you starting at Mount Oliver on FBL2.
After pickups on route you will make
deliveries to Fort Fairfax. An exchange
has you continuing on PRRR2 at
Trentwood
Deliveries at
Cascadia Mine #2 and
Cascadia Mine
#1. Series ends at
Cascadia Mine #1
---------------------------------------------
Description
of this Work Order:
04C:You
are operating from Yonder to Fort Fairfax
on the FBL2
You will
pickup box cars at
Yonder:
==32768-0 to
3 Yonder Industrial 1 [Blue Boxes]
==32769-0 to
3 Yonder Industrial 2 [Green Boxes]
You will drop
off cars at Fort Fairfax:
==0-1 to 8;
32768-0 to 3; and 32769-0 to3 on Fort
Fairfax Siding #1
==0-9 to 21
on Fort Fairfax Siding #2
--------------------------------------------
Proceed
to Fort
Fairfax Wye 1
and stop.
---------------------------------------------
This series
concludes at Fort Fairfax. There is a
Divisional Activity on PRRR that continues
this activity.
----------------------------------------------
GaryH
NERR Engineer
#100
--SW Division
Certificate
#02-2-NERR100D
-----------------------------------------------
Full Bucket
line version 2.0 Schematic Diagrams at
http://www.fullbucket.com/msts/map.html
Please refer
to these maps for orientation.