NERR SOUTHWEST DIVISION
Copyright MMIII
---------------------------------------------------------
NERP-LYD-100-01B-Mine
Yard Duty: York Canyon Mine
Briefing:
NERP-LYD-100-01B-Mine York Canyon Raton Pass 2
Work Order:
NERP-LYD-100-01B-Mine
Board: Yard
Time: 9:02 a.m.
Season: Summer Weather:
Rain
Rating: 1-Easy
Duration: 1 hour 20 minutes
Train: NERR GP30-#3019
-------------------------------------------
Description
of Work Order:
Yard Duty: Prepare a coal
train. SIX AC6000s and SIXTY loaded coal cars. Spot cars
for loading. York Canyon Subdivision Data: Southwest No.
1 Timetable available at http://www.bnsf-ttc.com/bnsftime/index.html
Yard: 15MPH speed limit.
All manual switching
------------------------------------------------
The activity will terminate
at York Canyon Yard by returning the engine to where you
started.
GaryH
NERR Engineer #100
SouthWest Division
--------------------------------------