NERR Copyright 2003
==================
Coyote Wells to El Centro
on the SDA2
Work Order:
NESD-LFLD-100-002-COY
Board: Local
Time: 15:05 p.m.
Season: Summer
Duration: 2 hour 10
minutes
Train: NERR GP-35 Unit
2035
Class: 1
-------------------------------------------
Obey all signals. Some
Reds are restriction only.
Signal Aspect Flashing
Yellow: Rule 282a 40 mph
Signal Aspect Solid
Yellow: Rule 285 30 mph
Signal Aspect Flashing
Red: Rule 290 15 mph
Signal Aspect Red with
Number Plate: Rule 291 Stop, request permission (Tab),
proceed
Temporary Speed 15 mph:
El Centro
--------------------------------------------
Activity:
The Work Order has you
starting at Coyote Wells Engine House Spur, MP 122.5
with Unit 2035. You will pickup loads at Plaster City
MP 130 for delivery to El Centro MP 148.
For SDA Version 2.
---------------------------------------------
Description of the Work
Order:
You will assemble your
train in Plaster City. Manual
switching Industrial Sidings 1 to 4. The
correct order is: 3-Bays: 32770: 0-3, 32769: 0-3,
I-Beams: 32771: 0-5 and 32772: 0-5
You will drop off
==3-Bays: El Centro
Industrial Siding #2
==I-Beams: El Centro
Industrial Siding #7
--------------------------------------------
Proceed to the El Centro
Parking Spur and stop.
----------------------------------------------
GaryH
NERR Engineer #100
Certificate
#02-2-NERR100D
-----------------------------------------------
Notes:
1. Grade -0.9% and -0.4%
from Coyoto Wells to El Centro.
2. Signals: You must be
completely in a block before reversing. If you are not
you will likely encounter a Red
signal.
3. I have used Conductor
messages for yard orientation. Hope I was clear.