South West Division

Expectations? ... Met!

 


San Diego & Arizona Freight Operations

 NESD-LFLD-100-002 work order

NERR Copyright 2003

==================

Coyote Wells to El Centro on the SDA2

Work Order: NESD-LFLD-100-002-COY

Board: Local

Time: 15:05 p.m.

Season: Summer

Duration: 2 hour 10 minutes

Train: NERR GP-35 Unit 2035

Class: 1

-------------------------------------------

Obey all signals. Some Reds are restriction only.

Signal Aspect Flashing Yellow: Rule 282a 40 mph

Signal Aspect Solid Yellow: Rule 285 30 mph

Signal Aspect Flashing Red: Rule 290 15 mph

Signal Aspect Red with Number Plate: Rule 291 Stop, request permission (Tab), proceed

Temporary Speed 15 mph: El Centro

--------------------------------------------

Activity:

The Work Order has you starting at Coyote Wells Engine House Spur, MP 122.5 with Unit 2035. You will pickup loads at Plaster City MP 130 for delivery to El Centro MP 148. For SDA Version 2.

---------------------------------------------

Description of the Work Order:

You will assemble your train in Plaster City. Manual switching Industrial Sidings 1 to 4. The correct order is: 3-Bays: 32770: 0-3, 32769: 0-3, I-Beams: 32771: 0-5 and 32772: 0-5

You will drop off

==3-Bays: El Centro Industrial Siding #2

==I-Beams:  El Centro Industrial Siding #7

--------------------------------------------

Proceed to the El Centro Parking Spur and stop.

----------------------------------------------

GaryH

NERR Engineer #100

Certificate #02-2-NERR100D

-----------------------------------------------

Notes:

1. Grade -0.9% and -0.4% from Coyoto Wells to El Centro.

2. Signals: You must be completely in a block before reversing. If you are not you will likely encounter a Red signal.

3. I have used Conductor messages for yard orientation. Hope I was clear.

 

 

Comments North Eastern Railroad
Last updated Sunday, June 06, 2004 03:05 PM
Copyright © MMIII Mutagenix Inc.