South East Division

We Did It Yesterday!

 


East River District Freight Operations

 Welcome to the East River District (ER) Route Local and Extra Board Freight Operations. Local Board Freight Ops are designed to be completed in sequence. Extra Board Ops are generally one time/one way special runs. When submitting your Time Slips you should also report them in sequence. Choose the work order to download it. North Eastern trains are required to run these work orders. Needed trains are listed in the README.TXT with in the work order's ZIP file.

View by Location
 

Work Order Class Length Date Description
D- NEER-110-04 1 1:30 08/01/04 30 coal hoppers from Walton to Glen Lyn Power by Antonio - more (note needs the East River Patch)
         
D- NEER-260-01 1 2:15 03/22/04 Take a loaded coal train up the line to Ripplemead Siding by Jim - more
D- NEER-260-01a 1 1:10 03/22/04 Take your power to Radford Army by Jim - more
D- NEER-260-01b 1 1:45 03/22/04 Take the 50 military boxcars over the line to Prineton Yard by Jim - more
D- NEER-260-02 1 1:30 04/03/04 Take a load of fuel from the Refinery to Radford Army Depot by Jim - more
         
S- NEER-034-001 2 2:00 03/06/04 Take a consist of tanker from Prineton to the refinery by Dave Flagg - more
         
D- NEER-219-01 1 2:00 02/23/04 See Continental page
         
D- NEER-042-01 2 2:00 01/30/04 Part 1 - Take a load from Walton Yard to Radford Army by silvermeteor - more
D- NEER-042-01a 2 0:40 01/30/04 Part 2 - Continuation from Radford to Ripplemead by silvermeteor - more
         
D-NEER-110-01 2 1:00 10/20/03 Take a consist of empty tanker from Prineton to the Refinery by Antonio Miranda - more
D-NEER-110-02 1 1:00 10/20/03 You are returning from Refinery to Prineton Station by Antonio Miranda - more
D-NEER-110-03 2 2:00 11/02/03 Bluefield Yard  to Radford Army Facilities by Antonio Miranda - more
         
         

 

 

Comments North Eastern Railroad
Last updated Sunday, August 01, 2004 07:38 PM
Copyright © MMIII Mutagenix Inc.