Roundhouse Ramblings

Claude's Corner
Taz's Tales
Old Heading  13 May  
Railroad Slang

May 2005

   21 May  Non-NERR News
  29 April  Other Downloads
  28 May  Fun Page

Send news, articles & other material to us. All contributions used with gratitude!!


 A bugless program is an abstract theoretical concept.

 

31 May

  • The 9  new work orders  today will keep you busy for more than 9 hours, if you do them all today - that will keep you out of mischief! It's the end of the month, and you need the money, so get going!

    • NECS-179-01 for the Clinton Subdivision. At 9.00am, you start your switching tasks in the Beverley Yard in an EMD SD40-2 (FURX Lease). They will take you about 1¼ hours.

    • NEDF-045-01 for v4 of the Dual Fictional route. Today, your work order is to take a GP38-powered local freight service from the M&RM Loco Depot to South Park with 2 shunts en route. It should take you just over 1 hour to complete this one.

    • NEDF-109-12 - another work order for the Dual Fictional route. Your task today is to take an early-morning run in a  CMT Shuttle  from Nuggett to Buffalo Island. To start your run, you are at the Nuggett service area, and you need to back out to the siding.

    • NEDF-109-12a - take your ALCo RS1 from BWF Mining  at Baers Canyon to the BWF Mining Lead and switch some tankers.

    • NEDF-109-12b - again, you are driving an ALCo RS1 in the area around the BWF Mining Lead, ending at Baers Canyon South after completing some switching tasks.

    • NEDF-109-12c. This time, you are in charge of an EMD SD24. You start your work order at Buffalo Island and finish it at Baers Canyon South. There's a lot of congestion, and you are following Unit 1 in dark territory at the beginning, so beware.

    • NEDF-109-12d. In your EMD SD24, you do a run from Baers Canyon South to South Park, with one pick-up near the start.

    • NEDF-109-12e. You are giving your EMD SD24 a good workout today. This work order tells you to take a 90 car train from South Park to Jacks Meadows. Your train is 4,761 feet in length and weighs 3,037 tons. Your power has 7,200, giving you 2.37 h.p. per ton. Is that enough?

    • NELV-047-01 for the Lehigh Valley route. In this work order, you will be using an NERR RS1 #1571 + ALCO RS2 Slug power setup to complete a steel mill switching task, taking your about 1¼ hours. You pick up NERR RS1 #1571 at the PBNE Engine shop. Your assignment is Bethlehem Steel Mill Switching. Plant Operations has been waiting for your shift to start. Blast Furnaces 1 through 5 are filling the slag cars at the back of the furnaces. They'll be full shortly and need to be taken to the slag dump as soon as they're full. You will proceed without delay to Slag Dump #1, pick up 5 empty slag cars, and bring them to the blast furnaces. Exchange them with the full cars, one at each furnace. When you have the 5 loaded slag cars, take them back to the slag dump and back them into Slag Dump #1. Uncouple, and pull forward and the activity will end automatically. You had better take your map of the area with you on this job - you'll probably need it!


 

29 May

  • It's nearly the end of the month, so let's take a look at the  Top 5 Engineers  in each Division:

    • South West Division has 5 of its own engineers in its Top 5.

    • North West Division has 4 of its own engineers in its Top 5.

    • South East and North East Divisions has 3 of their own engineers in their Top 5.

    • Central Division has 2 of its own engineers in its Top 5.


 

28 May

  • 2  new work orders  for you today:

    • Pocahontas District - NEPO 110-06. At 3.30pm, you are suddenly called on to drive a BR&T GP38-powered train to evacuate the local people in Gilbert County, when a large storm with heavy rainfalls and high winds cover the area. Pick up the evacuees from Gilbert County and the surrounds and convey them safely to Wharncliffe, where a special train will take them to the area's Emergency Storm Evacuation Shelters. You will need to be extremely cautious due to damaged bridges and tracks. Obey all dispatch instructions, and try not to leave anybody behind. MOW crews are working hard to keep the tracks in a safe condition.

    • North Coast Railroad - NENC-067-05A. Heavy rains in Southern California have caused massive destruction. Hundreds of people are now without homes. Lumber companies all along the North Coast are donating massive amounts of lumber and building materials to assist with the reconstruction. Your job is to pick up various loads of lumber from the lumber mills that line these tracks and deliver them to the south for distribution. Now people can start the rebuilding again. Watch for restrictions and be prepared to stop short of men and equipment, as you drive your ALCo C628 diesel on a 5 hour work order between Samoa and Scotia Lumber.

  • There are currently  10 rookies  undertaking the WCN induction program, which precedes their entry onto the NERR callboard as qualified NERR engineers. All of them have joined the program since mid-May.

  • The team developing the TrainMaster Train Simulator (TMTS) - the  2nd generation TS program  - have set up a website to keep us up-to-date with progress on their work. Some of the features that they list include:

    • "Advanced graphics with a level of detail unseen in train simulation.
    • Dynamic sounds accurately following the behavior of the train.
    • Cab interiors modeled in full 3-D.
    • Models, routes, and activities produced by the best developers in the train simulation community.
    • Advanced physics replicating real engine, car, and load behavior.
    • New track system supporting real world GPS coordinates."

  • The  Bison Rail System  has released the 5 different paint schemes that have been used on their locomotives throughout their history - shown in the table below in thumbnail size (click on the picture to see a larger version):


Phase 1

Phase 2

Phase 3

Phase 4

Phase 5

 

26 May

  • The last few days, your writer was in Canberra, our national capital (down here in Australia). It's the home of our national parliament (like Washington DC is for the U.S.A.). The parliament is housed in the building shown on the right. There is no railway in or through Canberra, so we can't show you any trains!

  • A  new route  has been released at t-s.com: Very Short Line RR. "This is a fictional railroad based on model railroading. This short line is a continuous loop track. At the ends of each loop is a turnout which allows endless loops." It's a 30Mb single-file download.

  • Just for  something different  near the end of the month:

The Mayonnaise Jar & The Coffee

When things in your life seem almost too much to handle, when 24 hours in a day are not enough, remember the mayonnaise jar...and the coffee...

A professor stood before his philosophy class with some items in front of him. When the class began, without a word, he picked up a very large, empty mayonnaise jar and proceeded to fill it with golf balls. He then asked the students if the jar was full. They agreed that it was.

So the professor then picked up a box of pebbles and poured them into the jar. He shook the jar lightly. The pebbles rolled into the open areas between the golf balls. He then asked the students again if the jar was full. They agreed it was.

The professor next picked up a box of sand and poured it into the jar. Of course, the sand filled up everything else. He asked once more if the jar was full. The students responded with a unanimous "yes." (Bit thick, weren't they!!??)

The professor then produced two cups of coffee from under the table and poured the entire contents into the jar, effectively filling the empty space between the sand. The students laughed.

"Now," said the professor, as the laughter subsided, "I want you to recognize that this jar represents your life. The golf balls are the important things - your God, your family, your children, your health, your friends, and your favorite passions - things that if everything else was lost and only they remained, your life would still be full. The pebbles are the other things that matter like your job, your house, and your car. The sand is everything else - the small stuff.

"If you put the sand into the jar first," he continued, "there is no room for the pebbles or the golf balls. The same goes for life. If you spend all your time and energy on the small stuff, you will never have room for the things that are important to you. Pay attention to the things that are critical to your happiness. Play with your children. Take time to get medical checkups. Take your partner out to dinner. Play another 18 holes. There will always be time to clean the house and fix the garbage disposal." Take care of the golf balls first - the things that really matter. Set your priorities. The rest is just sand."

One of the students raised her hand and inquired what the coffee represented.

The professor smiled. "I'm glad you asked. It just goes to show you that no matter how full your life may seem, there's always room for a couple of cups of coffee with a friend."


 

21 May

  • A recent  new route  released at t-s.com was the Zafra-Jerez de los Caballeros route - a real line from the RENFE (Spanish National Railways) in the south-west of Spain. The download is 1 file of about 95Mb (an executable file), which expands to 237 MB on your hard disk. XTracks and New Roads add-ons are not needed.

Era: 1988-1998. The prototypical operations on the route are mainly freight - steel products, foil reels, and scrap.

Length of Mainline: 47 Km. 2 branches - the Merida-Seville line and the Zafra-Huelva line. 3 sidings - Zafra station, Burguillos, Llanos de la Granja and Jerez de los Caballeros. 1 station with passenger service (Zafra). Several abandoned stations (Alconera, Burguillos, Llanos de la Granja [only goods], Jerez de los Caballeros [only goods].

All single track, non-electric. Fully landscaped. FPS - from 18 to 45 (as tested on a 3.2 GHz, 2 GB ram, graphic card 256 MB).

Several activities provided with the route. They were made with the rolling stock that is used on the real route. The necessary consists are in the folder "documentacion". The necessary rolling stock is available at http://trensim.com/.

  •  Do you remember this?  In late 2000 and early 2001, the following notice appeared on various games websites. It heralded the start of the virtual railroad world that we are now part of. The computer specifications are interesting!

Microsoft Train Simulator

"Take the controls from the engineer's cab with thousands of tons of freight behind you and exciting challenges ahead, or relax in the passenger's seat and enjoy the unfolding scenery. From steam engines to diesel to electric, immerse yourself in the sights, sounds, and adventures of Microsoft Train Simulator.

Authentically recreated trains, routes, and sounds. Nine drivable locomotives with realistic controls. Hundreds of miles of accurately detailed routes across three continents. Real-world train operation activities and challenges from novice to expert. Customize your trains, create new routes and activities."

Release date: 6 March, 2001, 1 JUNE, 8 June. Later in UK by about a month.

Minimum: Pentium II 266 MHz, 32 MB RAM, Windows 95/98/ME/2000, DirectX 7.0a, 4 MB DirectX-compatible video card, DirectX-compatible sound card, 4x CD-ROM drive, and 500 MB hard-disk space.

Recommended: Pentium 350 MHz and 64 MB RAM.

$US11.95


 

20 May

  •  Where do our members live?  All around the world! The table below shows the states and countries where we live. There are multiple members in many of the locations. There are a few members who have not told us where they live. But this gives you a good idea of the global nature of the NERR.

Alaska
Arkansas
Arizona
California
Colorado
Connecticut
Delaware
Florida
Georgia
Idaho
Illinois
Indiana
Iowa
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Nebraska
New Jersey
New York
North Carolina
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia

Belgium
Brazil
Chile
Czech Republic
Denmark
France
Germany
India
Israel
Italy
Netherlands
New Zealand
Portugal
Russia
South Africa
Spain

Alberta
British Columbia
Manitoba
Nova Scotia
Ontario
Quebec
Saskatchewan

New South Wales
Queensland (3 of us!)
South Australia
Victoria

England
Scotland
Wales


 

19 May

  • Want  better smoke  for your locomotives?

    • Try the solution at this website. You can download a replacement smokemain.ace to be placed in your Global/Textures folder. The default smokemain.ace will be renamed to "Copy_of_default_smokemain.ace".

    • You can also download a file called steamrep.zip from the file library over at Train-Sim.com.

    • At UKTrainSim, you can download file #9758 (221Kb). "This simple patch will upgrade the visual quality of the diesel fumes within Microsoft Train Simulator. The fumes are all photo realistic and can be used with a diverse array of traction."

  • You know about locos and rolling stock, but how much do you know about  the rail  that the trains run on? There is no part of any railroad that is as important as the item that gave the industry its name: the rail. The rail, combined with vehicles with flanged-wheels, assisted the development of a system of transport that was very distinct from the regular road transport system.

The earliest railroads used wooden rails, which wore out very rapidly. Later, railroads were built of wooden rails capped with thin iron strips to provide a smooth running surface for the wheels. All-iron rails were imported from Britain as early as 1831, with the first ones being produced in the U.S.A. in 1844. By 1850, iron rails were standard throughout America.

But iron rails were brittle because of its high carbon content. Post-Civil War developments such as the Bessemer process reduced the cost of steel to the point that it was economical to use in rails. In 1880, about 30% of all track was laid with steel rails; by the turn of the century, steel had almost completely replaced iron. Steel rail is composed of iron, carbon, manganese, and silicon, and contains impurities such as phosphorous, sulphur, gases, and slag. The proportions of these substances may be altered to achieve different properties, such as increased resistance to wear on curves.

The standard configuration for North American rail looks like an upside-down T. The three parts of the rail are called the base, web, and head. The flat base enabled such rail to be spiked directly to wooden crossties; later, rail was placed on the now-standard steel tie plate. While the proportions and precise shape of rail have changed, the basic T-section has been standard since the mid-19th century.

The most common way of describing rail is in terms of its weight per linear yard (the British unit of length). In the late 19th century, rail was produced in a range of sections weighing between 40 and 80 lbs. per yard. Weights increased over time, so that rail rolled today weighs between 112 and 145 lbs. (The Pennsylvania Railroad's 155-lb. section, used for a time after World War II, was the heaviest used in the U.S.A.) Generally, the greater the tonnage or the higher the speeds on a given line, the heavier the rail used will be. Because of the cost of track maintenance, the longer life of heavier rail makes it preferred even for urban transit systems, where loads are light and speeds low. Heavier rail sections are often used at road crossings, switches, and crossings at grade with other rail lines.

The length of standard rails has historically been related to the length of the cars used to transport them. From an early range of 15-20 feet, rail length increased with car size until a standard of 39 feet (easily accommodated by the once-common 40-foot car) was reached. Even with the advent of today's longer cars, 39 feet has remained the standard for rail because of the limitations in steel mills and ease of handling.

The joints in rail — its weakest points — can make for a rough ride. Individual rails are joined with steel pieces called joint bars, which are held in place by 4 or 6 bolts. Today, the 6-bolt type, once reserved for heavy-duty applications, is standard. The bolts in a joint bar are faced alternately outward and inward to guard against the remote possibility that a derailed car's wheel would shear them all off, causing the rails to spread. Transition between rails of two different weights is achieved with special angle bars. In territory where the rails serve as conductors for signal systems, bond wires must be used at the joints to maintain the circuit.

The problem-prone nature of rail joints prompted the most easily recognized advance in rail technology: the adoption of continuous welded rail (CWR). From its early use on a few railroads in the 1940s, welded rail has come to be used in almost all applications. It is produced by welding standard 39-foot (or the newer 78-foot) segments together into quarter-mile lengths at dedicated plants. The rails are transported to where they're needed in special trains, which are pulled slowly out from under the rail when it is to be unloaded. When in place, CWR is often field-welded into even greater lengths. Much jointed track survives because of the long lifespan of even moderately used rail, and because the specialized equipment needed for CWR installation is not economical for short distances.

Managing the expansion and contraction that comes with temperature change is important with CWR. To avoid expanding and potential buckling when in service, welded rail is laid when temperatures are high (or it is artificially heated). Rail anchors clipped on at the ties keep the rail from getting shorter as it contracts with falling temperatures. Thus constrained, it shrinks in cross section (height and width), but not in length. Because it's in tension, welded rail is treated with care during track work in cold weather.

Under heavy traffic, rails get worn down, although their life can be extended by grinding the head back to the proper contour. Purpose-built machines are used to grind the rails. Rail no longer suited for main-line use may still have some light-duty life in it and is often re-laid on branches, spurs, or in yards. When rail wear is uneven at a given location (such as a curve), rail may be transposed from one side to another to get maximum use out of it.

From an article by Robert S. McGonigal


 

17 May

  • Announcement!

 NERR acquires the Pocahontas Route!

Brian Element, the NERR's MOW Director, today announced that the NERR has finalised the acquisition of the Pocahontas route for the NERR network.

"No decision has yet been made whether this route will be an additional route in the South East Division, or whether it will replace one of the existing routes in the division." Brian said. "Discussions are continuing on this matter."

This route was previously owned and operated by the Norfolk Southern. Deep within West Virginia coal country, the Pocahontas route covers 100 miles of double track main line from Bluefield, WVa to Williamson, WVa.

Second only to the Powder River Basin, the Pocahontas region is one of the major sources of coal in the U.S.A. This route has numerous branch lines that serve coal mines deep in the mountains. Even though coal traffic is the mainstay of the route, general merchandise freights, unit grain, autoracks, and intermodal trains use the line to cross the Flattop Mountain and move out of the Appalachian mountains on to the Midwest.

  • 5 new work orders today - for the Pocahontas route:

    • NEPO-110-01 - Coal Train. This is a hard 3+hour winter work assignment, driving an  NERR BQ23 + SD40b
      at the head of a heavy coal train (3 power units and 45 loaded hoppers) from Williamson to Bluefield.

    • NEPO-110-02 - Transfer assignment. This is a short (less than 1 hour) drive in the Speedster. The crew from the last incoming train needs to replace the crew of the tanker train that is waiting at Tug station. As you are in a non-signalized branch line we can do the things a little differently, such as running on the rear of other train. You are to follow the train that passes you before you enter the mainline to Tug Station.

    • NEPO-110-03 - Mixed Train. This work order should take you less than 1½ hours in your NERR HI-16-16. Drive a mixed train, both freight and workers, from Weller to Devon. You will receive instructions en route to pick up work crews and another freight train.

    • NEPO 110-04 - Working in the Mountains. Drive a mixed train, powered by 1 SD40 + 1 SD45 (Leased Units), consisting of both freight and empty gondolas from Bluefield to Consol Coal Mine. It should take you about 1½ hours. You will receive instructions during your work. You have pickups at Bluefield West Yard Track# 3 and Cliff Yard Track #3 with a setout at Cliff Yard track #4.

    • NEPO 110-05 - Under the Storm. Your power for this 2+ hour work order is 1 Alco C628 + 2 Alco C636 locomotives. It is winter, and it is snowing, and it is a tough assignment! During a heavy snow storm, you need to drive a fully loaded tanker train from Cedar Bluff to Auville Yards. Track conditions are poor. Check your sander and your brakes!


 

16 May

  • Here is a simple tutorial on a manual method  to alias a locomotive . The easiest way is really to use ConBuilder, but it's often good to know another way to do it. This example uses the default GP38. You can adjust the files to fit almost any other installed locomotive.

Open the eng file in the locomotive folder, using a unicode editor such as WordPad in Windows XP. Then, you need to make the following changes:
  • To alias to the GP38 cabview, you must change the cabview line from:

CabView ( gp38.cvf )

to this:

CabView ( "..\\..\\GP38\\CABVIEW\\gp38.cvf" )

  • To alias the sounds the lines need to be changed to this:

Sound ( "..\\..\\GP38\\SOUND\\gp38cab.sms" )

and

Sound ( "..\\..\\GP38\\SOUND\\gp38eng.sms" )

  • (To alias to a cabview or sound that is loaded as a common cab or sound, change the cabview to the correct cvf or sms.)

 

15 May

  • Interesting website: Trainorders.com operates a major  webcam network . Their webcams have made available millions of images on the internet since 1997. This year, they started to use cameras that provide full motion video and sound. 3 webcams are available without registering - Tehachapi Pass, Dunsmuir I-5 Corridor, and the new one on the Sandpatch route.

  • 2  new work orders  today - NECV-047-01 for the Chippewa Valley route. This is an MOW work order, starting at 10:00am - and it will take you about 50 minutes to complete. Your task is as follows: there was a nasty derailment in the East End Main Yard that tore up sections of Yard Tracks #1 and #2. MOW crews have been working around the clock to clear up the mess and put the Yard Tracks back in service. Fortunately, Main Line Track #2 wasn’t affected, but it was a challenge to keep main line traffic running, since the work on Yard Track #1 often fouled the Main. At this point, all rolling stock involved in the derailment has been removed, and the Yard Tracks have been replaced and re-aligned. All that remains is to put additional ballast where necessary and ballast tamping. That’s where you come in. You have been assigned as the operator of NERR's RRS 09-3X Tamper #9740 working under direction of the MOW Track Foreman.

During this assignment, you will be under strict control of both the Dispatcher and the Track Foreman. Pay attention to the messages they have for you. Also active is the MOW Extra, Engine #9728, with 4 ballast cars to place the final ballast prior to tamping. Due to main line traffic, the Dispatcher requests that all switching be manual and requests you to ask for permission to pass any red signal.

  • NENE-061-10b for the North Eastern Corridor V4 route. The time is 1:00pm. The season is summer. The weather is clear. This run from Bayview Yard to Philly Snyder Avenue should take you about 2 hours 15 minutes.

  •  ConBuilder  Update: a Minor Fix file has been released. You can download it from the ConBuilder forum over the NERR forums - click here to open the forum thread.  It's a 450Kb zip file that you unzip into your ConBuilder folder. The fix is to adjust the program to handle the following:

    • MSTS has a 30 character limit on consist names; and

    • Some people like to use extra spaces in eng files.


 

14 May

  • The second of our NERR steam locomotives is the  4-8-2 'Mountain' . Here is some background to this fast, powerful locomotive that was used very successfully for both passenger and freight trains.

As railroads became a more popular means of travel and transport, railroad companies had to develop a steam locomotive with greater power than the 'Pacific' to handle the heavy passenger trains in mountainous terrain. An example of this need was on the Chesapeake & Ohio Railroad. As the number of cars increased on its passenger trains, it became necessary to double-head the currently-used "Pacifics" to get the longer trains over the Allegheny Mountains.

In 1910, the C&O asked the American Locomotive Company (Alco) to build them a more powerful locomotive. The engineers at Alco studied the railroad's route conditions and their other requirements. They recommended a locomotive with eight drivers, like the 'Mikado', for traction, to which they added a four-wheel lead truck, like the 'Pacific', for speed and riding stability. The result was a new wheel arrangement, the 4-8-2.

The first 4-8-2 in North America was built at Alco’s Richmond plant and delivered to the C&O in 1911. The 4-8-2 did the job for the company successfully, and the locomotive type acquired the name 'Mountain' from its main purpose.

Other railroads ordered 4-8-2s, and the design evolved quickly. The 62-inch diameter drivers used on the early examples were increased to 69 inches (on C&O's second order), and up to 73 inches. Boiler size and power were also increased substantially. By the early 1920s, a new 4-8-2 did not resemble the original C&O locomotives in many ways at all.

The ways in which they were used also changed. These large, powerful locomotives were ideal for fast freight service, so the 'Mountain' became a dual purpose locomotive, handling both heavy passenger trains and fast freight consists equally well.


Used courtesy of www.frisco1522.org - this example was built in 1926 by the Baldwin Locomotive Works of Philadelphia for service on the St. Louis - San Francisco Railway.

The 4-8-2 found a home in both the mountains of the west and the flat territory of the mid-west and south-east. They were successful in both types of landscape because they had good speed as well as great power. Many of the western railroads owned large fleets of 4-8-2s: Southern Pacific owned 83, Union Pacific had 60, Santa Fe acquired 51, and Great Northern owned 43.

The Canadian National acquired its first 'Mountain' in 1923. Its last batch, 20 semi-streamlined 4-8-2s delivered by the Montreal Locomotive Works in 1944 (nicknamed Bullet Nosed Betties), were the final steam locomotives purchased by the railroad.

The Rock Island and Missouri Pacific were two mid-western railroads with large fleets of 'Mountains'. In the south-east, the Seaboard and Florida East Coast placed their 4-8-2s at the head of long consists of heavyweight Pullmans headed for Florida.

The 'Mountain' distinguished itself as a fast freight engine, particularly in the east. There were many users, but three railroads had especially noteworthy fleets. New York Central received its first 4-8-2s in 1916 (and relabeled them 'Mohawks'). By the time its last was built in 1944, it had purchased 600 of them. The Central used them mainly in fast freight service, but the last 50, built by Lima during World War II, were also used in heavy passenger service. Central’s rival, the Pennsylvania Railroad, ordered 301 engines of its Class M-1 design between 1923 and 1930. They were used primarily as main-line fast freight locomotives. Together, the two eastern railroads owned almost half the 4-8-2s built for U.S. railroads.

The Illinois Central took a different route. After initially acquiring 60 locomotives from commercial builders between 1923 and 1926, the railroad decided to build its own 4-8-2s. 56 were constructed at its Paducah, Ky., shops from 1937 to 1942, using the boilers from surplus 2-10-2s. Paducah built an additional 20 engines between 1942 and 1943 with all new parts. IC’s early 4-8-2s were dual service locomotives, but the Mountains built at Paducah were exclusively for freight.

As train lengths increased and schedules were tightened in the late 1920s, railroads began looking for a more powerful locomotive, which led to the introduction of the 4-8-4. However, rather than replace the 4-8-2, the 4-8-4 complemented it. 'Mountains' continued to be built and used for assignments not requiring the power of a 4-8-4.

The last steam locomotives acquired by the Baltimore & Ohio — and also the last 4-8-2s built — were assembled at the railroad’s shops in Baltimore in 1948.

By that time, 41 railroads bought or built over 2,200 'Mountain' locomotives.

The 4-8-2 was the locomotive that demonstrated the value of combining eight coupled drivers with the speed potential of the leading four wheel truck. Had the engineers, in 1911, recognized the serious limitation of the two trailing wheels and had allowed more weight by adding a trailing four wheel truck then the ultimate dual-purpose locomotive would have been developed 16 years earlier than the 1927 introduction of the "Northern".

The table below lists the railroads that used the 'Mountain' locomotives, the numbers that were in their fleets, and the companies that built them.

Railroad Line Quantity, Builder
Alaska Railroad 2 Baldwin
Atchison, Topeka & Santa Fe 51 Baldwin
Baltimore & Ohio 2 Baldwin, 42 B&O
Bangor & Aroostook 10 ALCO
Boston & Maine 18 Baldwin
Canadian National Railway 42 CLC, 32 MLW
Canadian Pacific Railway 2 CPR
Central Vermont 4 ALCO
Central of Georgia 27 ALCO, 5 Baldwin
Chesapeake & Ohio 8 ALCO, 2 Baldwin
Chicago, Burlington & Quincy 13 BLW, 8 Lima
Chicago, Rock Island & Pacific 62 ALCO
Delaware, Lackawanna & Western 45 ALCO
Denver & Rio Grande Western 30 ALCO, 10 Baldwin
Florida East Coast 90 ALCO
Grand Trunk Western 5 Baldwin
Great Northern 28 Baldwin, 15 LIMA
Illinois Central 35 ALCO, 25 LIMA, 76 IC
Lehigh & Hudson River 3 Baldwin
Lehigh Valley 6 ALCO
Louisville & Nashville 22 Baldwin
Minneapolis, St. Paul & Sault Sainte Marie 18 ALCO, 3 Soo
Missouri Pacific 33 ALCO
Nashville, Chattanooga & St. Louis 5 ALCO, 8 Baldwin
New Orleans Great Northern 3 ALCO
New York Central 435 ALCO, 165 Lima
New York, New Haven & Hartford 70 ALCO
New York, Ontario & Western 20 ALCO
Norfolk & Western 10 ALCO, 12 Baldwin, 26 N&W
Pennsylvania 225 Baldwin, 50 LIMA, 26 PRR
Richmond, Fredericksburg & Potomac 4 ALCO
Rutland 4 ALCO
St. Louis - San Francisco 30 Baldwin, 34 SLSF
Seaboard Air Line 25 ALCO, 36 Baldwin
Southern Pacific 34 ALCO, 49 SP
Southern 58 Baldwin
Tennessee Central 4 ALCO
Texas & Pacific 5 ALCO, 5 Baldwin
Union Pacific 60 ALCO
Wabash 25 Baldwin
Western Railway of Alabama 2 ALCO

 

13 May

  • To all the  triskaidekaphobics  out there today: we hope that you have a relaxing and happy day!

  • Part 1 of a  new Old Heading article  from Bill is published today - follow the link at the top of this page.

  • 1  new work order  for today - for the Chippewa Valley route: BRS-CV-0003. It's 9:00am, and you will spend about the next 2 hours in your NERX MP15AC. After a dark and stormy night, sunshine has returned as you complete the morning rounds. This work order is the third in the series. Here we go! Reverse out of Phillips Scrap, pick up the load of tractors on EC Industrial #5 (and the caboose) and proceed to Risburg Implements. Spot the caboose on the siding lead, pull forward past the switch, and spot the tractors for later placement. Pick up the consist at Risburg Implements, bring it forward, and spot it short of the switch to EC Feed. Pull forward, using manual switching move the tractors (from EC Industrial) to Risburg Implements. Pick up the consist on EC Feed and then the consist from Risburg Implements. After main line traffic has cleared at about 9:45am, pick up the caboose and proceed to COOP Grain. Using manual switching, enter the siding, separate the caboose and the tractors, pull forward and place the consist from EC Feed. Pull forward, run around the siding, pick up the caboose and spot it on the run around track. Pick up the consist from Risburg Implement, add the caboose and proceed toward the paper mill. There is an unmarked 15 mph speed restriction beginning at the signal before Peter's Meats. Spot the consist on the main, pick up the consist at the Paper Mill, retrieve the spotted consist, and proceed to US Rubber. Following the same procedure, pick up the consist at US Rubber and continue to East End Main Yard. Spot the caboose on the main, place the consists on Main Yard #3, retrieve the caboose and deliver it to Maintenance Standby where the work order will end. It's probably not as complicated as it reads!

  • From one extreme to the other! The two photos below show  railroad stations . One is in Helsinki (click on the photo to view a larger version), Finland, and the other is at Bogantungan, in western central Queensland. The photos are not the same scale! Bogantungan (meaning 'grass and tree') is only a very small settlement (about 30 people), but the station was the change-over point for train crews travelling on that line - that's why the station is so large.


 

12 May

  • Have you had trouble deciding which work order to run next? Try using the  Random Work Order Selection  facility on the NEAWOS page on our website. You might find your next favourite work order!end of route

  • You might have noticed the  hit counter  that has been added to the bottom of this page - impressive figures already! Thanks for reading this news page.

  • When you get to the  end of a route  and find that the track just ends - usually without even a set of buffers - how do you feel? What if the route ended like the one in the picture to the right (click on the thumbnail to the right to view a larger version)? This one came from a forum that I read some time ago - the writer had modified the route for his own amusement. This is meant as a comment, not as a criticism of any of the work done by that special breed of people - route builders - who provide us with the basis for our MSTS fun.